With the 2022-2023 school year coming to a close, we want to provide an update of things which are in the process to begin with the passage of our 2023 Bond. These items listed are currently underway or will begin as soon as school is out. We will continue to keep you posted as we complete our projects. This is such an exciting time for Drumright Public Schools and again, thank you to our community!
Projects underway:
- All district classrooms interactive panels installed
- Renovation of the field house/weight room
- Bradley Elementary security entrances
- Bradley Elementary cafeteria expansion
- Bradley Elementary 6th grade classrooms preparation
- Bradley Elementary new cafeteria tables
- Bradley Elementary office reconfiguration
- Bradley Elementary tile replacement
- Bradley Elementary interior painting
- Bradley Elementary playground fencing
- Bradley Elementary playground demo/cleanup to replace asphalt
- Bradley Elementary playground concrete surfacing with shade tents
- Restroom demo/renovation for all Bradley Elementary
- Teacher parking area south of Bradley Elementary
- Begin HVAC replacements districtwide
- Band instruments reconditioning
- Design for Ag Shop to be on campus
- Engineering and testing drilling to begin May 8th
- Old administration building renovation
- Painting of the field house exterior building
- New interior walls in field house
- New HVAC units in the field house
- Plumbing for additional showers, toilets, urinals, and sinks in the field house
- Top dressing of the football, softball, baseball fields
- Signage for all school buildings and athletic complexes
- Softball and baseball fencing
- Softball and baseball equipment upgrades
- Softball and baseball bullpen designing
- Softball and baseball water lines for field
- Softball locker room renovation
- Softball and baseball backstop padding and netting replacement
- New protective/safety flooring in the field house
- New lighting for the indoor facility
- New and additional weight equipment